1970 Chris Craft Constellation
Item History & Price
MerMad is currently on the hard, undergoing bow/stem repair (see below).Twin 327Q motors, ran fine the last operating season (2017) before boat was hauled for stem repairs. Edelbrock carburators, Mallory low pressure electric fuel pumps - with electrical relay, oil pressure safety switch (with momentary bypass switch for cold starts).
Marine Air Cabin Mate 16K BTU air conditioner.
Custom fabricated cockpit enclosure - stainless steel frame, canvas, eisenglass - 2014
Boat... was hauled early 2018, due to a leak in bow/stem area. A small hole was discovered in port side bow inner plank. Bow outer planks (bottom 3) were removed so that inner plank sections, port and stbd, could be replaced. Localized stem damage (rot) was cleaned, treated, and repaired with thickened West System epoxy (pictures available). New meranti inner planks were cut, treated (w/CPES) and installed. Outer planks being installed per Chris Craft original build methods - using Dolfinite bedding compound and canvas between plank layers on all seams. Outer planking nearly complete on stbd side (garboard plank to go), 3 bottom planks remain to be installed on port side *.
* Due to new job and travel I have not had the time necessary to dedicate to this repair job, and would like to see MerMad go to a new owner who can devote more time to her. On Nov-20-19 at 11:27:16 PST, seller added the following information:
Marine Air Cabin Mate 16K BTU air conditioner.
Custom fabricated cockpit enclosure - stainless steel frame, canvas, eisenglass - 2014
Boat... was hauled early 2018, due to a leak in bow/stem area. A small hole was discovered in port side bow inner plank. Bow outer planks (bottom 3) were removed so that inner plank sections, port and stbd, could be replaced. Localized stem damage (rot) was cleaned, treated, and repaired with thickened West System epoxy (pictures available). New meranti inner planks were cut, treated (w/CPES) and installed. Outer planks being installed per Chris Craft original build methods - using Dolfinite bedding compound and canvas between plank layers on all seams. Outer planking nearly complete on stbd side (garboard plank to go), 3 bottom planks remain to be installed on port side *.
* Due to new job and travel I have not had the time necessary to dedicate to this repair job, and would like to see MerMad go to a new owner who can devote more time to her. On Nov-20-19 at 11:27:16 PST, seller added the following information: